Could I help you?
  • Reduced price
  • New

SAE AS683

$78.00
$35.10 Save 55%
SAE AS683 Revision D, March 1, 2012 Installation Procedures and Torques for Fluid Connections
Quantity

Description / Abstract: These procedures cover the following:

Paragraph 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket.

Paragraph 4 - Boss end connections, positioned type, with back-up ring.

Paragraph 5 - Boss end connections, positioned type, without back-up ring

Paragraph 6 - Boss end connections, non-positioned type.

Paragraph 7 - Bulkhead connections.

Purpose

To establish standard installation procedures for fluid connection parts listed in this standard.

All parts with lockwire holes shall be lockwired per AS567.